extension cable power 10 kv boiler Agent
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
KV Boiler flow RG Female connection R½ (male thread) for additional control Power consumption (burner and control unit) the accessory "Extension for heating circuits 2 and 3" is required. Control panel Vitocontrol control panel with e.g. Vitotronic 200-H, type HK1B or Get Price
Boiler. 12 kW DHW 14L / min DHW 20L / min HP 3 kW Boiler. 24 kW New house. 8 Geolia. 9 •3197 U Compressor electrical power. 33 Air bleeder Expansion vessel class A circulating pump Tank 16L + Coaxial Exchanger Controller box Extension Card to manage 2 circuits (Option) 41Get Price
*Calculations based on data provided by European Program-2001` for EU27 Fuel boiler efficiency: 89%, Gas boiler efficiency: 93% Kefid -15 -10 -5 50 11kW High Power model (WOYG112LBT) Rated level Keep rated capacity at low outdoor temperature. 5 4.30 3.90 Control Cable UTW-T30XA UTW-KCLXA Cooling Kit UTW-KSPXA UTW-KCHXA 1. Not available Get Price
Related News biomass based power plant boiler Agent in hungary High Pressure CFB Biomass Boiler for Power Plant extension cable power 10 kv boiler AgentGet Price
The power of the boiler must provide heating for the dwelling. Boiler power is selected on the basis of 1 kW per 10 m2 of floor space. For example, you need an electric boiler to heat a house of 30 square meters, therefore, its power must be at least 3 kW, but if you need to heat a room of 90-100 m2, then, accordingly, the power value is Get Price